Scope of Work:
- Study the route survey report and recommend route of Overhead Transmission line (approx.7 KM) and Underground Cable line (approx. 0.2 KM),
- Prepare the Transmission line profile on recommended route by PLS-CADD,
- Prepare the Tower/Pole scheduling on the on the recommended 132 KV single circuit transmission line,
- Estimate the cost of required for Right of Way (ROW),
Prepare the BOQ for major equipment/material and estimating the preliminary high-level budget for the transmission line, Bay equipment & panels and extension of gantry.