Construction of 400kV Transmission Line (Permanent Connection).

Project Name :

Construction of 400kV Transmission Line (Permanent Connection).

Start Date :

Client :

China Energy Engineering Group Northeast No.1 Electric Power Construction Co., Ltd (NEPC)- LCC JV of Bangladesh Summit Meghnaghat II Gas Turbine Engineering Project Department

Scope

Site Survey, Design of 400kV Gantry, Plan & Profile and Foundation, Supply of electrical equipment’s, Complete project management.

Related Projects

screenshot-2021-01-13-at-3.23
PLS CADD Feature Classification of 27.6km existing Line LiDAR Survey Data at Texas Buffalo
Picture9
Design services for “Design, Supply, Installation, Testing & Commissioning of the Aminbazar-Gopalganj 400KV Double Circuit Transmission Line on Turnkey basis” Project of PGCB, ADB funded
solar-4824555_960_720
Preliminary Design, TenderDocumentation & Project Bidding Assistance for132kV Transmission Line and Bay Extension of50MW Solar Power Plant.
sean_brady_construction_and_engineering_ltd_cover
Economically and TechnicallyOptimized Plan and Profile, Tower Design andFoundation Design of 400 kV, 230 kV & 132 kVTransmission lines
Picture7
Designing of 400 KV TL Towers (re-design of 5 types and new design of 2 types). It includes 185m river crossing tower design.
power-transmission-line-1024x514
Construction of 400kV Transmission Line (Permanent Connection).
China-Energy-Engineering-Corporation-Limited-CEEC-logo
Design services for “Design, Supply, Installation, Testing and Commissioning of 230/132 kV GIS Substation at Kachua, 132/33 kV GIS Substation at Muradnagar, Lakhsam, Chandina, Koshba, Laxmipur”- Project of PGCB, WB funded.
132kv-220kv-400kv-substation-equipment
950 km PLS CADD Modeling (132kV, 230kV & 400kV)